We are almost completed with our Oregon City Alley Enhancement project. This project began in November of 2014 and is slated to be completed on time and on budget in March 2015. Check out the pictures below to get a glimpse of our progress.

800 Block Finished Product

800 Block Finished Product

Prepping for Concrete in the 700 Block

Prepping for Concrete in the 700 Block and completing utility installation

Installing Conduit in the 700 Block

Installing Conduit in the 700 Block

Cavico NW placing concrete in the 700 block

Cavico NW placing concrete in the 700 block

Using a pump truck to place concrete in the 700 block

Using a pump truck to place concrete in the 700 block

pump truck in 700 block